Nestle Metal Bellows

Case Study – Heat Exchanger Bellows Repair

During Nestle planned 2 week shutdown a failure in a bellows unit within a critical heat exchanger was discovered. This failure prevented Nestle’s production re-starting and would have had significant effect on the business. Nestle contacted Arcflex to resolve this issue as we have done similar jobs in the past. Arcflex designed a specialist unit […]

Failed Metal Bellow

Case Study – Langage Power Station Compensator Repair

Alstom Power came to Arcflex with a failed bellows in situe at Langage Power Station, the unit had failed and it was critical to replace the unit during the scheduled shut down. If the bellows was not replaced then the power station could not successfully be put back on line. The original supplier of the […]